Progression Shoots

The same site, flown the same way, every visit, so a twelve-month build reads as one continuous sequence instead of a folder of loose photos.

Overview

Progression Shoots

A progression shoot is the same site flown again and again from matched altitude, angle and framing. That consistency is the entire point. When the frames line up, a year of work becomes readable in thirty seconds, and nobody has to squint at two photos taken from different corners of the lot.

We schedule around your milestones rather than a fixed calendar, so each visit lands on something worth recording. Everything comes back dated and organized by stage, and when the build finishes you get a completion edit cut from the whole sequence.

At a Glance

Cadence
Milestone-based, not calendar-based
Best for
Builds running 3 months or longer
You receive
Dated archive by stage + completion edit
Rate
Per visit, below one-off pricing
Scope

How we keep the sequence consistent

The Sequence

One build, four stages,
the same frame every time

A real Central Florida commercial build, flown from the same position across ten months. Longer projects simply add visits between these points.

01

Site Prep & Grading

Cleared, graded and compacted, before anything went vertical.

02

Slab Down

The pad poured and cured, the whole footprint in one frame.

03

Structure Up

Steel, walls and roof in place. Obvious from 200 feet, invisible from the road.

04

Complete & Open

Paving, striping, landscaping and signage. The closing frame.

Who It's For

Built for the people who use the images

Developers on long builds

One continuous record across the whole program, not a scatter of one-off shoots.

Owners tracking draws

Visual proof that each stage was reached, dated and ready for the lender.

Marketing teams

A finished story to launch with, the build compressed into something people will actually watch.

Questions

About progression shoots

We would rather schedule around milestones than a fixed calendar. Site prep, foundation, pour, vertical construction, dry-in and completion each mark a visible change worth recording. On longer commercial builds, monthly visits between milestones fill the gaps nicely.

Still worth doing. We set the reference framing on the first visit and run consistently from there. You lose the early stages, but everything from that point forward lines up properly.

Yes. Progression visits are quoted per visit at a lower rate than one-off shoots, because the planning, airspace checks and site knowledge carry over after the first trip.

More answers on the FAQs page, or call 352-738-7088.

Related

Often booked alongside this

Construction Documentation

Site overviews, pour-day coverage and as-built records for the project file.

Commercial Real Estate

Frontage, access and trade-area context that a site plan cannot show.

Events

Groundbreakings, ribbon cuttings, tournaments and festivals from above.

Ready to get started?

Tell us the site and the timeline. Most quotes come back the same day.

Scroll to Top